Line Maintenance Cavalon

 

Here we supply all documents for downloads which you need for maintenance works of the level "Line".

 

Event and Configuration Log:

AG-F-ECL-CV-EN-V3.D_DL.pdf [116 kb]

Inspection Protocol Cover Sheet:

AG-F-PCS-EN-V2.A.pdf [538 kb]

Inspection Protocol 25/100 HRS:

Cavalon Periodic Service Worksheet [609 kb]

 

Cavalon Work Report [186 kb]

Ground Test Run:

AG-F-PGR-CV-EN-V2.A.pdf [467 kb]

Functional Test Flight:

AG-F-PTF-CV-EN-V2.A.pdf [46 kb]

   

Manufacturer Maintenance Manual LNE:

 

MMM_CV_EN_16-06-13_LNE.pdf [7,4 MB]